07 March 2010

7 Mac 2010

*** This week 7/3/2010 - 11/3/2010 ***

To do

1. Check every Access Point - Location / Vlan / SSID / model / u_name & passwd
2. Check every switches replace by IBH - label, right place, condition of rack.
3. HRMIS connection from one lab .. buka serentak -> slow ke tak?
4. Pemurnian dokumentasi pelupusan --> refer back to Syira -> finalize kasi saya check dulu
5. LI - student -> buku log update
6. LI - student -> website uptm bila leh jalan
7. LI - student -> projek thumbprint -> status ?
8. LI - student -> projek men'electronik'kan borang laporan kerosakkan.

Sekian, terima kasih

05 March 2010

5 Mac 2010

*** KHAMIS 4 MAC 2010 ***

- 2 LI student ambik cuti
- Masalah DHCP from firewall
- Config 10.10.20.11 --> eth1/23 --> tengok balik
- Nak tukar vlan ke 48 sebab ip tak cukup
- Pelupusan masih dalam terumbang ambing lagi
- SK Padang Terap call mintak PC 10 unit
- KUKP call Pengarah masih stick pada Pekeliling jangan kasi sewa makmal.