kerja - kijer - keroje - keje - all about works -
13 December 2010
28 November 2010
Doing n done n not done
Done
1. Intergration egnet n kpmnet via fw.
2. KPMnet down is up again
3. Intelsoft PM done 2:00pm @ 28.11.2010
4. PM for network devices n rack
Not done
5. LO / RM5k > DONE successfully
6. Report > Sumbangan / JPICT / KPMNET
Doing
7. ABM query 2011
8. Student LI what should do?
1. Intergration egnet n kpmnet via fw.
2. KPMnet down is up again
3. Intelsoft PM done 2:00pm @ 28.11.2010
4. PM for network devices n rack
Not done
5. LO / RM5k > DONE successfully
6. Report > Sumbangan / JPICT / KPMNET
Doing
7. ABM query 2011
8. Student LI what should do?
01 November 2010
Planning 2011
Plan plan plan :-
1. Tiada lagi crt monitor
2. PC clone KK dihantar ke cybernet
3. Medium duty network printer mono A4 size 4:1
4. Heavy duty network printer colour 12:1
5. AP to cover all campus
6. PC desktop more than 5 years max 7 years > lupus
7. Lupus server / network devices 2003 and below
8. LCD projector untuk dewan dan bilik serbaguna
9. Kemaskini harta modal dengan penyelenggaraannya.
1. Tiada lagi crt monitor
2. PC clone KK dihantar ke cybernet
3. Medium duty network printer mono A4 size 4:1
4. Heavy duty network printer colour 12:1
5. AP to cover all campus
6. PC desktop more than 5 years max 7 years > lupus
7. Lupus server / network devices 2003 and below
8. LCD projector untuk dewan dan bilik serbaguna
9. Kemaskini harta modal dengan penyelenggaraannya.
24 October 2010
24 Oktober 2010
Nak kena buat 24 Oktober 2010
1. Claim Oktober
2. Take Out edge yang tidak digunakan - takut rosak
3. DHCP copy data to old server
4. Diagram untuk admin / whole campus /
16 August 2010
07 March 2010
7 Mac 2010
*** This week 7/3/2010 - 11/3/2010 ***
To do
1. Check every Access Point - Location / Vlan / SSID / model / u_name & passwd
2. Check every switches replace by IBH - label, right place, condition of rack.
3. HRMIS connection from one lab .. buka serentak -> slow ke tak?
4. Pemurnian dokumentasi pelupusan --> refer back to Syira -> finalize kasi saya check dulu
5. LI - student -> buku log update
6. LI - student -> website uptm bila leh jalan
7. LI - student -> projek thumbprint -> status ?
8. LI - student -> projek men'electronik'kan borang laporan kerosakkan.
Sekian, terima kasih
To do
1. Check every Access Point - Location / Vlan / SSID / model / u_name & passwd
2. Check every switches replace by IBH - label, right place, condition of rack.
3. HRMIS connection from one lab .. buka serentak -> slow ke tak?
4. Pemurnian dokumentasi pelupusan --> refer back to Syira -> finalize kasi saya check dulu
5. LI - student -> buku log update
6. LI - student -> website uptm bila leh jalan
7. LI - student -> projek thumbprint -> status ?
8. LI - student -> projek men'electronik'kan borang laporan kerosakkan.
Sekian, terima kasih
05 March 2010
5 Mac 2010
*** KHAMIS 4 MAC 2010 ***
- 2 LI student ambik cuti
- Masalah DHCP from firewall
- Config 10.10.20.11 --> eth1/23 --> tengok balik
- Nak tukar vlan ke 48 sebab ip tak cukup
- Pelupusan masih dalam terumbang ambing lagi
- SK Padang Terap call mintak PC 10 unit
- KUKP call Pengarah masih stick pada Pekeliling jangan kasi sewa makmal.
- 2 LI student ambik cuti
- Masalah DHCP from firewall
- Config 10.10.20.11 --> eth1/23 --> tengok balik
- Nak tukar vlan ke 48 sebab ip tak cukup
- Pelupusan masih dalam terumbang ambing lagi
- SK Padang Terap call mintak PC 10 unit
- KUKP call Pengarah masih stick pada Pekeliling jangan kasi sewa makmal.
Subscribe to:
Posts (Atom)