08 September 2009

7 September 2009

*** 7 Sept 2009 *** isnin

- Core Switch Buat Hal Lagi -

ipcop sumtime cannot ping gateway at core switch.
pc client also cannot ping gateway at core switch.

sumtime can ping N reply but intermitent
can see the pattern
0.233ms
0.723ms
1.490ms
2.1xxms
3.xxxms
then again
0.xxxms
0.xxxms

apa lagi nak di check?

-- benchmark vlan management --
choose 4 places in education sector around sg petani / perlis / alor setar


-- sumber manusia --
macam mana nak setelkan pemutusan sandangan

-- perolehan --
opsss !!!

10 August 2009

10 Ogos 2009

*** 29 Julai 2009 *** Rabu

- Problem Core Switch On

streamyx modem -- 192.168.1.254
|
|
ipcop -- 192.168.1.9 (RED)
| -- 10.160.49.4 (GREEN)
|
Core Switch -- 10.160.49.254
|
|
|
LAN internal 10.160.49.0/24


client pc - 10.160.49.xx buleh ping 10.160.49.254 (gateway)
ipcop 10.160.49.4 TAK BULEH ping 10.160.49.254.
destination host unreachable

~~~~~~ SOLVED ~~~~~~ 26 Julai 2009

*** 3 Ogos 2009 *** Isnin

- Sign - SPP untuk Pusat Sumber / UAT Paradigm System

*** 4 Ogos 2009 *** Selasa

- En. Wan call suruh sign jugak kerana paradigm akan datang kutip pada hari ni.
- Dalam jam 11 En. Wan akan datang kutip.
- En. Wan akan bertanggungjawab sepenuhnya.
- Call semula dalam 10 min. Pengujian data connection hanya dalaman. dari host ke server elmu.


*** 6 Ogos 2009 *** Khamis

- metro-e siap installation + configuration
- hantar student balik pendang jam 11:45pg
- late --> 6 ptg

*** 8 Ogos 2009 *** Sabtu

- Sukaneka Merdeka IPDA
- Join Bolasepak 9 sebelah -
- kalah penuh dramatik - 60 - 30 - 90

*** 9 Ogos 2009 *** Ahad

- Vlan are using metro-e (unofficially launch)
- invois JARING received
- pengesahan

28 July 2009

28 Julai 2009

- Wireless sudah siap pasang kantinpaknon 10:49pg
- Wireless sudah siap pasang 3comJPK 12:55tgh
- Request masa meeting JKPICT
- Mesiniaga call akan datang pada Isnin 3 Ogos 2009
- Raise floor akan pasang Khamis dan Jumaat
- Induksi besok jalan sampai 31/7/2009
- Cabling failure TP's room status -CLEAR-

09 July 2009

9 Julai 2009

Clear bilik UTMK
- Makmal 5 --> rosak item
- Satee lama buang
- Rak makan anai2 jalan je kat luar


29 June 2009

29 Jun 2009

Inisiatif ICT
- PPSMI Fasa 5 dan 6 sahaja ada data
- akan email by end of the day (today)

SB
- TP kata next week kita sidang
- JK dah lantik ke belum

MB
- Pakai je PC yang mana ada. Ask KJ - kalo buleh nak baru aaa baru laju.
- Makmal bahasa ---> No PC at all.
- New tag L001 until L008

HRMIS
- Bagi kat EO jam 11:15pg
- Staffing
- Profile created
- Problem

Notebook
- Ask them to write a letter to TP/P
- Kebertanggungjawaban - HKM

AGS
- Hantar invoice
- Canon PIXMA MP 150 exchange 145 if worth it

Nak kena gerak jam 2 petang bawak anak klinik.

28 June 2009

28 Jun 2009

Call in jam 9:15 a.m
- suruh ambik PC kat JPJPK 2 unit rosak.
- ambik jam 10:30 pagi - done. ( Mintak PC baru)

12:00 tgh ..
- Close SB .. angkat kotak bawa masuk bilik PEK
- Lab .... no problem.

KK
- Penyelenggaraan dan penggunaan makmal
- Makmal bahasa ---> No PC at all.
- New tag L001 until L008

Dell C640
- Windows XP buleh bikin trial N error software JAHAT

4:45 petang
- Puan minta tolong disable WGA -- gomen punya pon tak Ori ke?
- Cikgu hantar CPU untuk pembaikan

Blah awai jugak ... ambik anak nursery

31 May 2009

31 Mei 2009

Call in masuk 8:15 a.m
- masuk kerje lambat
- PA call buat budget Rangkaian Kampus

Telefon EGnet
- down jam 8:30 setel jam 11:30 pagi TM call.
- AA datang start keje 10 pagi

Makmal
- 3 makmal akan ditutup
- PM dan kemaskini
- Tiada makmal akan diberikan kepada pensyarah selain JTM

Lambat balik
- 6:10 dok dalam lab lagi tunggu AA