24 October 2010

24 Oktober 2010

Nak kena buat 24 Oktober 2010

1. Claim Oktober
2. Take Out edge yang tidak digunakan - takut rosak
3. DHCP copy data to old server
4. Diagram untuk admin / whole campus /

07 March 2010

7 Mac 2010

*** This week 7/3/2010 - 11/3/2010 ***

To do

1. Check every Access Point - Location / Vlan / SSID / model / u_name & passwd
2. Check every switches replace by IBH - label, right place, condition of rack.
3. HRMIS connection from one lab .. buka serentak -> slow ke tak?
4. Pemurnian dokumentasi pelupusan --> refer back to Syira -> finalize kasi saya check dulu
5. LI - student -> buku log update
6. LI - student -> website uptm bila leh jalan
7. LI - student -> projek thumbprint -> status ?
8. LI - student -> projek men'electronik'kan borang laporan kerosakkan.

Sekian, terima kasih

05 March 2010

5 Mac 2010

*** KHAMIS 4 MAC 2010 ***

- 2 LI student ambik cuti
- Masalah DHCP from firewall
- Config 10.10.20.11 --> eth1/23 --> tengok balik
- Nak tukar vlan ke 48 sebab ip tak cukup
- Pelupusan masih dalam terumbang ambing lagi
- SK Padang Terap call mintak PC 10 unit
- KUKP call Pengarah masih stick pada Pekeliling jangan kasi sewa makmal.


18 October 2009

18 Oktober 2009

*** 28 September 2009 ***

1. Justifikasi fiber dari Gerko ke Asrama / SB --> done
2. Meeting Penentuan Speks - Jadual 30/9 --> 5/10 done
3. Tech Specs submit to admin on 1/10/09 --> done
4. Invois / MyNIC / Jaring --> done
5. Claim --> done Thanks to Ikhram

08 September 2009

7 September 2009

*** 7 Sept 2009 *** isnin

- Core Switch Buat Hal Lagi -

ipcop sumtime cannot ping gateway at core switch.
pc client also cannot ping gateway at core switch.

sumtime can ping N reply but intermitent
can see the pattern
0.233ms
0.723ms
1.490ms
2.1xxms
3.xxxms
then again
0.xxxms
0.xxxms

apa lagi nak di check?

-- benchmark vlan management --
choose 4 places in education sector around sg petani / perlis / alor setar


-- sumber manusia --
macam mana nak setelkan pemutusan sandangan

-- perolehan --
opsss !!!

10 August 2009

10 Ogos 2009

*** 29 Julai 2009 *** Rabu

- Problem Core Switch On

streamyx modem -- 192.168.1.254
|
|
ipcop -- 192.168.1.9 (RED)
| -- 10.160.49.4 (GREEN)
|
Core Switch -- 10.160.49.254
|
|
|
LAN internal 10.160.49.0/24


client pc - 10.160.49.xx buleh ping 10.160.49.254 (gateway)
ipcop 10.160.49.4 TAK BULEH ping 10.160.49.254.
destination host unreachable

~~~~~~ SOLVED ~~~~~~ 26 Julai 2009

*** 3 Ogos 2009 *** Isnin

- Sign - SPP untuk Pusat Sumber / UAT Paradigm System

*** 4 Ogos 2009 *** Selasa

- En. Wan call suruh sign jugak kerana paradigm akan datang kutip pada hari ni.
- Dalam jam 11 En. Wan akan datang kutip.
- En. Wan akan bertanggungjawab sepenuhnya.
- Call semula dalam 10 min. Pengujian data connection hanya dalaman. dari host ke server elmu.


*** 6 Ogos 2009 *** Khamis

- metro-e siap installation + configuration
- hantar student balik pendang jam 11:45pg
- late --> 6 ptg

*** 8 Ogos 2009 *** Sabtu

- Sukaneka Merdeka IPDA
- Join Bolasepak 9 sebelah -
- kalah penuh dramatik - 60 - 30 - 90

*** 9 Ogos 2009 *** Ahad

- Vlan are using metro-e (unofficially launch)
- invois JARING received
- pengesahan